13/05/2018 The Hoyland, Pinewood School Reading corner Everest steps Everest steps at end of learning corridor
17/02/2018 Ralph Allen School Masterplan Masterplan for Ralph Allen School The Rose Building (left), the Lee Centre (right) Katherine Johnson Building, 2020 (left), the Rose Building, 2014 (right), Dining Hall, 2019 (centre) Katherine Johnson Building (2020) The Rose Building (2014) Katherine Johnson Building (2020) The Lee Centre (2012) The Lee Centre (2012) Dining Hall (2019) Jatherine Johnson Building from undercroft of Rose Building Rose Building (2014) in foreground with Katherine Johnson Building (2020) beyond