Masterplan for Ralph Allen School
The Rose Building (left), the Lee Centre (right)
The Rose Building (2014)
The Lee Centre (2012)
The Lee Centre (2012)
Katherine Johnson Building, 2020 (left), the Rose Building, 2014 (right), Dining Hall, 2019 (centre)